construction.xml

The construction.xml configuration file contains configuration for building construction stages. Construction stages can be added, edited, or deleted.

The "foundation-list" element contains multiple "foundation" elements that represent a foundation construction stage. A "foundation" element contains the following attributes: "name", "constructable", "salvagable", "work-time", and "skill-required". The "name" attribute has to be a unique name for the stage. The "constructable" attribute is true if the foundation can be constructed and false if not. The "salvagable" attribute is true if the foundation can be salvaged and false if not. The "work-time" attribute is the total amount of effective work time (millisols) (See Time) required to complete the foundation construction. The "skill-required" attribute is the minimum construction skill required for an architect to start the foundation construction mission.

The "foundation" element contains the following child elements:

The "frame-list" element contains multiple "frame" elements that represent a frame construction stage. A "frame" element contains the following attributes: "name", "constructable", "salvagable", "work-time", and "skill-required". The "name" attribute has to be a unique name for the stage. The "constructable" attribute is true if the frame can be constructed and false if not. The "salvagable" attribute is true if the frame can be salvaged and false if not. The "work-time" attribute is the total amount of effective work time (millisols) (See Time) required to complete the frame construction. The "skill-required" attribute is the minimum construction skill required for an architect to start the frame construction mission.

The "frame" element contains the following child elements:

The "building-list" element contains multiple "building" elements that represent a building construction stage. A "building" element contains the following attributes: "name", "constructable", "salvagable", "work-time", and "skill-required". The "name" attribute has to be a unique name for the stage. The "constructable" attribute is true if the building can be constructed and false if not. The "salvagable" attribute is true if the building can be salvaged and false if not. The "work-time" attribute is the total amount of effective work time (millisols) (See "conf/time.txt") required to complete the building construction. The "skill-required" attribute is the minimum construction skill required for an architect to start the building construction mission.

The "building" element contains the following child elements: